FEATURED WORK
Atwood Memorial Center Ballroom Reconstruction
Mechanical | Electrical
14,000-square foot ballroom reconstruction
Atwood Memorial Center Hydronic System Study
Mechanical
Study of the existing system and recommendations for future modifications
Boiler No. 2 and No. 3 Rebuild
Mechanical | Electrical
Rebuild of two existing 150# steam boilers (1,200 and 1,800 horsepower) and the installation of new dual fuel burners located in the Central Plant
Brown Hall Predesign Study
Mechanical | Electrical
Study for upgrades and renovations
Chilled Water Study
Mechanical | Electrical
Study evaluated the existing and future loads of the Central Chilled Water Plant
Central Chiller Water Plant
Structural | Mechanical | Electrical
Central Chiller Water Plant Predesign
Structural